Machining centers
CNC machining capability for custom metal, plastic, tooling, and equipment components. Machine assignment is confirmed per RFQ.
Review detailsCapability control
ProtoRFQ connects each process claim to the drawing, the inspection method, and the evidence expected with the order.
CNC machining capability for custom metal, plastic, tooling, and equipment components. Machine assignment is confirmed per RFQ.
Review detailsElectrical-discharge processes for hardened components, detailed profiles, deep features, and mold-component geometry.
Grinding and secondary operations are reviewed where flatness, fit, surface condition, or tooling performance requires them.
Inspection planning may use vision measurement, CMM, height measurement, and conventional gauges according to the drawing.
Metals and engineering plastics are checked against grade, availability, machining behavior, and documentation needs.
Packaging assumptions are reviewed around part protection, corrosion risk, weight, shipment method, and destination.
| Capability | What the RFQ has to state | What confirms it |
|---|---|---|
| Machining centers | Envelope, critical features, tolerance basis, quantity | Machine assignment confirmed per RFQ |
| Wire EDM and EDM | Hardness or heat-treatment state, profile detail, feature depth | Process route agreed against the drawing |
| Grinding and finishing | Flatness, fit or surface condition requirement, and the sequence it sits in | Reviewed where the requirement makes it necessary |
| Dimensional inspection | Which characteristics are critical, and the acceptance basis | Inspection plan built from the drawing, not assumed |
| Material review | Grade, condition, certificate scope and lot linkage | Checked against availability and documentation needs |
| Export packaging | Corrosion risk, weight, shipment method, destination | Packaging assumptions reviewed and stated in the quote |
Published standards
These define the language used above. ProtoRFQ claims no approval under any of them; the standard that governs a project is the one named in the RFQ.