Precision parts · tooling components · export RFQs

Make the drawing manufacturable before it becomes expensive.

Upload your CAD package for a structured review of process, material, tolerances, inspection, and delivery assumptions.

  • 50 MB per file
  • Drawings stay private
  • Assumptions shown before production
84.00Ø 12 H7
RFQ REVIEWProcess + tolerance + inspectionAssumptions recorded before quote
Machined metalsEngineering plasticsMold componentsDrawing-controlled inspection

Manufacturing scope

Route each part to the process it actually needs.

Each request starts with the drawing package rather than a generic price table. Geometry, material, tolerance, finish, quantity, and inspection are reviewed before the process is proposed.

Quote discipline

A clearer handoff from CAD to production.

Open items are identified before order release. The quote states what is included, what still needs confirmation, and which inspection outputs are expected.

01

Upload the package

Send CAD, drawings, material, quantity, finish, and the inspection points that matter.

02

Engineering review

The RFQ is checked for process fit, missing tolerances, special characteristics, and inspection scope.

03

Quote with assumptions

Pricing is returned with the selected process, lead-time basis, exclusions, and open questions.

04

Produce and inspect

Approved requirements become the working reference for production and inspection records.

Evidence before claims

Capability pages rely on reviewed, traceable process media.

Visual references are checked, cleaned, translated, and matched to current capability pages. Items without clear context or usable detail are left out.

01Asset logged
02Edit checked
03Embedded text cleared
04Delivery file verified

Ready for review

Send the drawing package. Keep the assumptions visible.

Upload CAD, PDF drawings, quantity, material, finish, and the dimensions that must be inspected.

Build an RFQ package
WA